The primary limitation of the first come,first served (FCFS)priority rule is that short jobs will tend to delay longer jobs that follow.

A) True
B) False

Correct Answer

verifed

verified

Input/Output (I/O) control is used to:


A) increase work flows and queues at a work centre.
B) ensure overloading of a work centre to maximize efficiency.
C) minimize WIP at a work centre
D) manage work flows and queues at a work centre.
E) maximize make-span.

F) A) and B)
G) B) and C)

Correct Answer

verifed

verified

Jack,the owner of Jack's Electronic Repair,currently has five jobs to be scheduled,shown in order in which they arrived: Jack,the owner of Jack's Electronic Repair,currently has five jobs to be scheduled,shown in order in which they arrived:   If Jack uses the shortest processing time first (SPT) priority rule to schedule these jobs,what will be the average flow time? A) 3 hours B) 5 hours C) 7 hours D) 7.2 hours E) 8 hours If Jack uses the shortest processing time first (SPT) priority rule to schedule these jobs,what will be the average flow time?


A) 3 hours
B) 5 hours
C) 7 hours
D) 7.2 hours
E) 8 hours

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

The following questions refer to the table data for jobs awaiting processing at a single work station (jobs are shown in order of arrival): The following questions refer to the table data for jobs awaiting processing at a single work station (jobs are shown in order of arrival):    What is the average flow time for the shortest processing time (SPT)priority rule? Average job lateness? Average WIP at the centre? What is the average flow time for the shortest processing time (SPT)priority rule? Average job lateness? Average WIP at the centre?

Correct Answer

verifed

verified

10 days; 4...

View Answer

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B: Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B:    In developing the sequence that will minimize make-span,where in the schedule sequence should the job W be placed? In developing the sequence that will minimize make-span,where in the schedule sequence should the job W be placed?

Correct Answer

verifed

verified

The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received: The owner/operator of the local franchise of Handyman,Inc.,has four jobs to do today,shown in the order they were received:   If he uses the shortest processing time first (SPT) priority rule to schedule these jobs,what will be the average job lateness? A) 0 hours B) 1.5 hours C) 1.75 hours D) 2 hours E) 2.25 hours If he uses the shortest processing time first (SPT) priority rule to schedule these jobs,what will be the average job lateness?


A) 0 hours
B) 1.5 hours
C) 1.75 hours
D) 2 hours
E) 2.25 hours

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

Sequencing is concerned with the order in which jobs are processed,while loading is concerned with assigning jobs to work centres or workstations.

A) True
B) False

Correct Answer

verifed

verified

The table below contains information about five jobs waiting to be processed at work station number three. The table below contains information about five jobs waiting to be processed at work station number three.   Using the CR rule,the sequence of jobs would be: A) c-a-b-d-e. B) a-b-d-e-c. C) d-e-b-a-c. D) c-a-b-e-d. E) e-d-b-a-c. Using the CR rule,the sequence of jobs would be:


A) c-a-b-d-e.
B) a-b-d-e-c.
C) d-e-b-a-c.
D) c-a-b-e-d.
E) e-d-b-a-c.

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

For a one machine/station shop,the shortest (imminent)processing time (SPT)priority rule will always result in the lowest average flow time.

A) True
B) False

Correct Answer

verifed

verified

All priority or dispatching rules involve complex computations intended to establish an optimal processing sequence for production facilities.

A) True
B) False

Correct Answer

verifed

verified

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B: Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B:    If these jobs were scheduled in the sequence shown,what would be the idle time at machine B? If these jobs were scheduled in the sequence shown,what would be the idle time at machine B?

Correct Answer

verifed

verified

The output of the system is limited by the output of the bottleneck operation(s).

A) True
B) False

Correct Answer

verifed

verified

Shift scheduling for services does not involve:


A) forecasting the amount of work to be done per time period.
B) assigning shifts to staff based on skill and availability.
C) converting work per time period into number of workers required
D) covering requirements with a minimum of shifts.
E) staffing at a constant minimum level to minimize wage costs.

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

The inability to store services makes staff scheduling for services more complex than for manufacturing companies.

A) True
B) False

Correct Answer

verifed

verified

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B: Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B:    In developing the sequence which will minimize make-span,what is the initial job to be placed in the schedule sequence? In developing the sequence which will minimize make-span,what is the initial job to be placed in the schedule sequence?

Correct Answer

verifed

verified

A schedule/control Gantt chart can be used to monitor job progress.

A) True
B) False

Correct Answer

verifed

verified

Determine the minimum number of workers needed,and a schedule for the following staffing requirements,giving workers two consecutive days off per cycle. 11eab92b_c47c_6436_99e6_a767f5b4975d

Correct Answer

verifed

verified

blured image_TB6896_00 (Bold = d...

View Answer

Which of the following is not a common criteria when using the Assignment model?


A) costs
B) prioritizing
C) profits
D) performance
E) optimization

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified

What is the optimum job sequence for the jobs listed below,using Johnson's Rule? 11eab92b_c479_cbf4_99e6_4fc80f07f601


A) e-g-f-d
B) d-g-f-e
C) d-f-g-e
D) e-d-f-g
E) f-e-d-g

F) C) and D)
G) A) and D)

Correct Answer

verifed

verified

Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B: Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A,then by Machine B:    What is the idle time at machine B for the optimum schedule? What is the idle time at machine B for the optimum schedule?

Correct Answer

verifed

verified