Priority rules generally assume that job setup cost is independent of processing sequence of jobs.

A) True
B) False

Correct Answer

verifed

verified

For the optimal schedule, what is the total number of hours it will take these consultants to complete these projects?


A) 53 hours
B) 46 hours
C) 50 hours
D) 61 hours
E) 54 hours

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

Given the following information concerning jobs awaiting processing at a single work center, what processing sequence will result if the critical ratio (CR) rule is used?

Correct Answer

verifed

verified

11ea6d31_2d93_b033_ada9_f18398315d12_TB2514_00 The sequence will be G - I - J - L - H.The schedule is as follows: 11ea6d31_2d93_b034_ada9_8bd1dc677a5d_TB2514_00

Line balancing is a major factor in the design and scheduling of low volume systems because of batch processing.

A) True
B) False

Correct Answer

verifed

verified

The assignment method is limited to a maximum of two jobs per resource.

A) True
B) False

Correct Answer

verifed

verified

Johnson's rule is a technique used to sequence jobs through a two-step work sequence.

A) True
B) False

Correct Answer

verifed

verified

One disadvantage of appointment systems is:


A) Capacity can be adjusted by varying hours.
B) The customer's desired time may be already taken.
C) People generally accept it as fair.
D) It can reduce customer waiting time.
E) Appointments do not have to be all the same length.

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified

What is the optimum sequence (first car to last) ?


A) A; B; C; D; E
B) E; D; C; B; A
C) E; B; D; C; A
D) E; D; B; C; A
E) E; B; D; A; C

F) B) and C)
G) A) and E)

Correct Answer

verifed

verified

B

Given the information below, determine the following: (A) Processing sequence using (1) SPT and (2) EDD. (B) Average completion time and average job tardiness using (1) SPT and (2) EDD.

Correct Answer

verifed

verified

If he uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average job tardiness?


A) 0 hours
B) 1.5 hours
C) 1.75 hours
D) 2 hours
E) 2.25 hours

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

If Eva uses the first come, first served (FCFS) priority rule to schedule these jobs, what will be the average completion time?


A) 3 hours
B) 5 hours
C) 7 hours
D) 7.2 hours
E) 8 hours

F) All of the above
G) B) and C)

Correct Answer

verifed

verified

Scheduling in service systems may involve scheduling:


A) the workforce.
B) the equipment.
C) (a) and (b) .
D) customers.
E) all of the above.

F) A) and C)
G) D) and E)

Correct Answer

verifed

verified

The priority rule which will sequence jobs in the order they are received is _________.


A) EDD
B) LIFO
C) SPT
D) CR
E) FCFS

F) B) and D)
G) B) and C)

Correct Answer

verifed

verified

The scheduling sequencing rule which always results in the lowest average completion (flow) time is the:


A) first come, first served (FCFS) rule
B) shortest processing time first (SPT) rule
C) earliest due date first (EDD) rule
D) least slack per operation first (S/O) rule
E) run until slack happens (RUSH) rule

F) None of the above
G) A) and C)

Correct Answer

verifed

verified

The two different approaches to load work centers in job-shop scheduling are:


A) load charts and schedule charts
B) Gantt charts and assignment method
C) infinite loading and finite loading
D) linear programming and makespan
E) none of the above

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

Batch process helps maximize worker efficiency.

A) True
B) False

Correct Answer

verifed

verified

If he uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average completion time?


A) 7.5 hours
B) 5 hours
C) 3 hours
D) 2.5 hours
E) 2 hours

F) C) and E)
G) A) and B)

Correct Answer

verifed

verified

A schedule chart can be used to monitor job progress.

A) True
B) False

Correct Answer

verifed

verified

Primary considerations in scheduling high-volume systems involve: (I) coordinating the flow of inputs (II) overcoming the disruptions to planned outputs (III) assigning workers to work centers


A) I and III
B) I and II
C) II and III
D) I, II, and III
E) II only

F) D) and E)
G) A) and C)

Correct Answer

verifed

verified

B

Scheduling pertains to:


A) hiring workers
B) process selection
C) buying machinery
D) timing the use of specific resources
E) determining the lowest cost

F) None of the above
G) D) and E)

Correct Answer

verifed

verified

Showing 1 - 20 of 134