Which sequencing rule is designed specifically to minimize job tardiness?


A) S/O
B) EDD
C) FCFS
D) SPT
E) LPT

F) C) and D)
G) A) and C)

Correct Answer

verifed

verified

Which of the following is critical to effective yield management?


A) one-price pricing
B) forecasting
C) capacity flexibility
D) constant demand
E) trained service personnel

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

If Eva uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average job tardiness?


A) 2 hours
B) 2.2 hours
C) 2.33 hours
D) 2.4 hours
E) 3 hours

F) B) and D)
G) None of the above

Correct Answer

verifed

verified

Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of Output to Input.

A) True
B) False

Correct Answer

verifed

verified

Use Johnson's Rule to determine the optimum processing sequence for the jobs listed below.Chart total throughput time.

Correct Answer

verifed

verified

Using the EDD rule, the sequence of jobs would be:


A) d-e-b-a-c
B) a-d-c-b-e
C) e-d-b-a-c
D) a-d-c-e-d
E) e-b-c-d-a

F) B) and D)
G) B) and C)

Correct Answer

verifed

verified

Which of the following is least likely to be a consideration when scheduling a high-volume system?


A) equipment failures
B) material shortages
C) accidents
D) worker absences
E) demand variability

F) A) and E)
G) C) and D)

Correct Answer

verifed

verified

Which of the following is the last step in the capacity/scheduling chain?


A) product planning
B) process planning
C) capacity planning
D) aggregate planning
E) scheduling

F) A) and B)
G) All of the above

Correct Answer

verifed

verified

When does idle time occur at machine B for the optimum schedule?

Correct Answer

verifed

verified

1 hour at the outset...

View Answer

If Eva uses the shortest processing time first (SPT) priority rule to schedule these jobs, what will be the average completion time?


A) 3 hours
B) 5 hours
C) 7 hours
D) 7.2 hours
E) 8 hours

F) C) and E)
G) B) and D)

Correct Answer

verifed

verified

The EDD priority rule usually does well with regard to _______.


A) Cost
B) Lateness
C) Overtime
D) Waste
E) Makespan

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

A schedule chart depicts the loading and idle times for a group of machines or departments.

A) True
B) False

Correct Answer

verifed

verified

Sequencing is concerned with the order in which jobs are done, while loading is concerned with assigning jobs to work centers or workstations.

A) True
B) False

Correct Answer

verifed

verified

After the row and column reductions, what is the reduced time for assigning resource 4 to job D?


A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours

F) B) and C)
G) D) and E)

Correct Answer

verifed

verified

The SPT priority rule always results in the lowest average completion time.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not an assumption of priority rules?


A) The set of jobs is known: no new jobs arrive after processing begins.
B) Setup time is independent of processing sequence.
C) Finite loading is assumed.
D) Processing times are deterministic.
E) No machine breakdowns are assumed.

F) B) and C)
G) B) and E)

Correct Answer

verifed

verified

What is the average completion time for the slack per operation (S/O) priority rule schedule? Average job tardiness? Average number of jobs at the center?

Correct Answer

verifed

verified

10.6 days;...

View Answer

What is the result of modifying the row and column reductions table?

Correct Answer

verifed

verified

What is the average completion time for the first come, first served (FCFS) priority rule schedule? Average job tardiness? Average number of jobs at the center?

Correct Answer

verifed

verified

11.6 days;...

View Answer

"Flow-shop scheduling" is used in high volume systems.

A) True
B) False

Correct Answer

verifed

verified