As long as a forecast is plus or minus 10%, MRP works well.

A) True
B) False

Correct Answer

verifed

verified

If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?


A) 48
B) 144
C) 192
D) 212
E) 272

F) None of the above
G) C) and D)

Correct Answer

verifed

verified

Which is true of a net-change system?


A) It is a batch-type system which is updated periodically.
B) It is usually run at the beginning of each month.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.

F) None of the above
G) A) and B)

Correct Answer

verifed

verified

The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.

A) True
B) False

Correct Answer

verifed

verified

The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:


A) master production schedule
B) bill-of-materials
C) inventory-records
D) assembly-time chart
E) net-requirements chart

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

The _________ of ERP makes it valuable as a strategic planning tool.


A) Internet base
B) Rapid Batch capability
C) Employee focus
D) Real-time aspect
E) Database structure

F) B) and D)
G) All of the above

Correct Answer

verifed

verified

A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n) :


A) assembly time chart
B) product structure tree
C) MRP II
D) pegging
E) Gantt chart

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:


A) master schedule
B) bill-of-materials
C) inventory-records
D) assembly-time chart
E) net-requirements chart

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1. Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1.     Develop a material requirements plan for end item P and its components, given the tree below.Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units. One hundred units of P should be available at the start of week 4 and at the start of week 8.Beginning inventories are: 20 P, 100 A, and 200F. Scheduled receipts are: 800 F at the start of week 1.

Correct Answer

verifed

verified

blured image blured image All items have zer...